An employee earns $20 per hour and 1.5 times that rate for overtime
Managerial AccountingCost Behavior & CVP
The problem
George assembles study packets on Accuity's production floor and is paid $20 an hour. His contract pays time and a half for any hours beyond 40 in a week. This week George logged 50 hours.
- What is George's total pay for the week?
- How much of his pay is overtime premium?
- How much of George's pay for the week is direct labor, and how much is manufacturing overhead?
An Accuity original. We write our own version of each problem and solve it from scratch, so you learn the method rather than copying an answer.
Video solution
Covers the full step-by-step solution below, start to finish.

Solved by
Jake Glidden, CPA, MSA
Founder of Accuity
Jake started Accuity while studying accounting at UCF and has worked with hundreds of students in introductory and upper-level accounting classes. Accuity solutions are checked against the textbook before they're published.
Certified Public Accountant (CPA) · B.S.B.A. in Accounting, UCF · M.S. in Accounting, UCF
More about Accuity →Step-by-step solution
The same steps the video works through, written out.
This problem tests how a factory worker's pay is split between direct labor and manufacturing overhead, and specifically how an overtime premium is treated.
The rule
An overtime hour has two parts:
| Part of an overtime hour | Amount | Classification |
|---|---|---|
| Regular rate | $20 | Direct labor |
| Premium (the extra 0.5 × $20) | $10 | Manufacturing overhead |
Every hour George spends assembling packets is direct labor at his regular rate, including the overtime hours. Only the premium goes to overhead. The reason: overtime usually happens because the whole factory is busy, not because of whichever job was running at 5 p.m. Charging the premium to that one job would make it look more expensive than the others for no real reason, so the premium is spread over all jobs through overhead.
Requirement 1 — Total pay for the week
| Hours | Calculation | Pay |
|---|---|---|
| Regular (first 40) | 40 × $20 | $800 |
| Overtime (10) | 10 × $20 × 1.5 | 300 |
| Total pay | $1,100 |
Requirement 2 — Overtime premium
The premium is only the extra half on top of the regular rate:
10 hours × $20 × 0.5 = $100
Note the difference from requirement 1: the $300 of overtime pay is $200 of regular-rate pay plus the $100 premium.
Requirement 3 — Direct labor vs. manufacturing overhead
| Classification | Calculation | Amount |
|---|---|---|
| Direct labor | 50 hours × $20 regular rate | $1,000 |
| Manufacturing overhead | Overtime premium | 100 |
| Total | $1,100 |
The split adds back to the $1,100 of total pay, which is the check.
Where students go wrong
- Putting all $300 of overtime pay into overhead. Only the $100 premium is overhead. The 10 overtime hours at $20 are still time spent making the product, so they are direct labor.
- Using 1.5 instead of 0.5 for the premium. The premium is the extra half, not the whole overtime rate.
- Stopping at 40 hours for direct labor. All 50 hours were worked on production. Direct labor is $1,000, not $800.
- Exception to know: if a specific customer's rush order caused the overtime, the premium can be charged to that job as direct labor. With no such fact given, it goes to overhead.
More Cost Behavior & CVP problems
- The salary that is sacrificed by a college student who pursues a degreeThis problem tests understanding of opportunity cost—the value of the next best alternative foregone when making a choice. A student's sacrificed salary represents an opportunity cost of pursuing full-time education.
- The tuition that will be paid next semester by a college studentThis question tests understanding of cost classifications in accounting. Future tuition payments represent out-of-pocket costs—actual cash expenditures that will be incurred, not sunk costs from the past.
- If the total cost of alternative A is $59,000 and alternative B is $49,000This problem tests understanding of differential cost—the difference in total costs between two alternatives. The $10,000 difference represents the incremental cost relevant to choosing between alternatives, not opportunity cost or sunk cost.
- The fixed costs per unit are $16 when a company produces 16,000 unitsThis problem tests understanding of how fixed costs behave on a per-unit basis as production volume changes. Fixed costs in total remain constant, so per-unit fixed costs decrease as production increases.
- Total costs are $260,000 when 20,000 units are producedThis problem tests understanding of cost behavior by requiring students to separate fixed and variable costs, then project total costs at a different production volume within the relevant range.
- Which is a true statement about variable cost behavior?Tests understanding of how variable costs behave per unit and in total as activity levels change. Variable costs remain constant per unit but fluctuate in total as production volume increases or decreases.
Got a different wording of this problem?
Assignments vary by school and semester. Share the version you were given and we'll add it so other students can find this solution.
Studying Cost Behavior & CVP for a class?
Accuity courses map to your actual syllabus — video lessons, exam-style practice, and walkthroughs for the problems you're assigned.