A new transmission in your truck will cost $5,500. Luckily, it should reduce maintenance expense by $3,650 each year for the next 10 years. What is the IRR of the transmission?
Business FinanceCapital Budgeting
What the question asks
a. 63.22%
b. 62.45%
c. 67.09%
d. 60.08%
e. 65.94%
Below is the Accuity problem: the same method with different numbers. We solve ours, so work through it and you'll know how to solve yours.
The Accuity problem
A new transmission for Accuity's delivery truck costs $6,500. It is expected to cut maintenance expense by $3,800 a year for the next 10 years.
- What is the internal rate of return (IRR) on the transmission?
An Accuity original. We write our own version of each problem and solve it from scratch, so you learn the method rather than copying an answer.
Video solution
Covers the full step-by-step solution below, start to finish.

Solved by
Jake Glidden, CPA, MSA
Founder of Accuity
Jake started Accuity while studying accounting at UCF and has worked with hundreds of students in introductory and upper-level accounting classes. Accuity solutions are checked against the textbook before they're published.
Certified Public Accountant (CPA) · B.S.B.A. in Accounting, UCF · M.S. in Accounting, UCF
More about Accuity →Step-by-step solution
The same steps the video works through, written out.
This question tests the internal rate of return (IRR) for an investment whose benefit is a level annual saving. Lower maintenance expense is a cash inflow, so the transmission is a $6,500 outflow today followed by ten $3,800 inflows.
The rule
The IRR is the rate that makes NPV = 0:
$6,500 = $3,800 × PVIFA(IRR, 10)
So the annuity factor at the IRR must equal:
PVIFA = $6,500 ÷ $3,800 = 1.71053
A ten-year annuity factor that small means a very high rate.
HP 10BII+ keystrokes
Because the inflows are equal, the TVM keys are fastest:
1 [shift] [P/YR]10 [N]6500 [+/-] [PV]3800 [PMT]0 [FV][I/YR]→ 57.85
(The cash flow method gives the same result: 6500 [+/-] [CFj], 3800 [CFj] 10 [shift] [Nj], [shift] [IRR/YR].)
Check the answer
| Rate | PVIFA(rate, 10) | PV of $3,800 a year |
|---|---|---|
| 50% | 1.96532 | $7,468 |
| 57.85% | 1.71053 | $6,500 |
| 60% | 1.65151 | $6,276 |
At 57.85% the savings are worth exactly the $6,500 cost, so NPV = 0.
Answer: the IRR is about 57.85%.
Why it is so high
Accuity recovers the full cost in under two years ($6,500 ÷ $3,800 = 1.71 years) and then keeps saving $3,800 a year for eight more years. A return that fast on such a small outlay produces a very high IRR. Any reasonable required return is far below 57.85%, so the transmission is clearly worth buying.
Mistakes to avoid
- Entering both PV and PMT as positive numbers. One must be negative or the calculator shows "no solution."
- Leaving a value in FV from a previous problem. Set FV to 0.
- Using N = 120 with P/YR = 12. The savings are annual.
More Capital Budgeting problems
- Lopez Industries projects A and B: MIRR compared with NPVModified internal rate of return for two mutually exclusive projects, compounding inflows at the required return, and a check of whether MIRR agrees with NPV.
- Neagle Corporation imposes a payback cutoff of 2.5 years: payback vs. NPVApplies a payback cutoff to two projects, then computes each project's NPV and shows where payback and NPV disagree, including the mutually exclusive choice.
- Project requiring construction expenses through year 2: IRR and NPVIRR and NPV for a project with three years of construction outflows before eight years of inflows, using grouped cash flows on the HP 10BII+.
- Consider the following cash flows that switch signs: IRR or NPV at 11%Non-conventional cash flows that change sign several times: computes the IRR, explains why IRR can be unreliable here, and confirms the decision with NPV and MIRR.
- Nonlinear Dynamics, Inc. must decide between two game projects: EAAChooses between two mutually exclusive projects with different lives and different risk-adjusted rates by converting each NPV into an equivalent annual annuity.
- Suppose your firm is choosing between two exclusive projects: PI vs. NPVRanks two mutually exclusive projects of different size by profitability index and by NPV, then explains why the ratio and the dollar measure disagree.
Got a different wording of this problem?
Assignments vary by school and semester. Share the version you were given and we'll add it so other students can find this solution.
Studying Capital Budgeting for a class?
Accuity courses map to your actual syllabus — video lessons, exam-style practice, and walkthroughs for the problems you're assigned.